Rollercoaster Tycoon

Time to hit the theme park for this amazing creative activity!

Trip Builder

  • Original group accommodation experts

    Founded in 2000
  • Best price guaranteed

    Unbeatable on like-for-like packages
  • Stress free planning

    Financially secured events
  • Accommodation:

    • Activities:

      • Evening:

        • Food:

          Rollercoaster Tycoon

          Quick Enquiry

          Rollercoaster Tycoon

          Quick Enquiry
          ★★★★★

          Simon - Fine dining at home!

          What's included:

          • Instructor
          • Equipment
          • We can also source a venue on request
          • Minimum Group Size is 10

          Time to hit the theme park for this amazing creative activity! Your challenge is to build a working rollercoaster for a ball to travel along for at least 45 minutes. The ball must travel via it’s own kinetic motion and flow through a number of thrilling twists and turns.

          Your group will be divided into teams of 10. Each team must be one section of the rollercoaster . Now comes the fun part. Instead of working in competition, the group are working in unison towards onecommon goal.
          Each teams section must connect the other teams to create one large construction. There are certain features that need to be included such as a loop the loop, and a hair pin bend.

          Now any theme park rollercoaster needs to look the part! Each section must have a unique theme. Teams can visit out prop shop for all kinds of creative material to make their ride look the part. Now it gets nail biting! Once complete it’s time for testing. Teams release the ball at the start of the ride, ready for it to make it’s journey past the finish line.

          As the ball flows along the track teams nervously watch in hope that their section performs. The event is perfect for mixed groups and always creates a huge sense of achievement and celebration.

          Show moreShow less
          ★★★★★

          Jasmine - Private chef was👌

          What's included:

          • Instructor
          • Equipment
          • We can also source a venue on request
          • Minimum Group Size is 10

          Time to hit the theme park for this amazing creative activity! Your challenge is to build a working rollercoaster for a ball to travel along for at least 45 minutes. The ball must travel via it’s own kinetic motion and flow through a number of thrilling twists and turns.

          Your group will be divided into teams of 10. Each team must be one section of the rollercoaster . Now comes the fun part. Instead of working in competition, the group are working in unison towards onecommon goal.
          Each teams section must connect the other teams to create one large construction. There are certain features that need to be included such as a loop the loop, and a hair pin bend.

          Now any theme park rollercoaster needs to look the part! Each section must have a unique theme. Teams can visit out prop shop for all kinds of creative material to make their ride look the part. Now it gets nail biting! Once complete it’s time for testing. Teams release the ball at the start of the ride, ready for it to make it’s journey past the finish line.

          As the ball flows along the track teams nervously watch in hope that their section performs. The event is perfect for mixed groups and always creates a huge sense of achievement and celebration.

          Show moreShow less
          ★★★★★

          Alison - Full of character

          What's included:

          • Instructor
          • Equipment
          • We can also source a venue on request
          • Minimum Group Size is 10

          Time to hit the theme park for this amazing creative activity! Your challenge is to build a working rollercoaster for a ball to travel along for at least 45 minutes. The ball must travel via it’s own kinetic motion and flow through a number of thrilling twists and turns.

          Your group will be divided into teams of 10. Each team must be one section of the rollercoaster . Now comes the fun part. Instead of working in competition, the group are working in unison towards onecommon goal.
          Each teams section must connect the other teams to create one large construction. There are certain features that need to be included such as a loop the loop, and a hair pin bend.

          Now any theme park rollercoaster needs to look the part! Each section must have a unique theme. Teams can visit out prop shop for all kinds of creative material to make their ride look the part. Now it gets nail biting! Once complete it’s time for testing. Teams release the ball at the start of the ride, ready for it to make it’s journey past the finish line.

          As the ball flows along the track teams nervously watch in hope that their section performs. The event is perfect for mixed groups and always creates a huge sense of achievement and celebration.

          Show moreShow less
          ★★★★★

          Sophie - So perfect for large groups

          What's included:

          • Instructor
          • Equipment
          • We can also source a venue on request
          • Minimum Group Size is 10

          Time to hit the theme park for this amazing creative activity! Your challenge is to build a working rollercoaster for a ball to travel along for at least 45 minutes. The ball must travel via it’s own kinetic motion and flow through a number of thrilling twists and turns.

          Your group will be divided into teams of 10. Each team must be one section of the rollercoaster . Now comes the fun part. Instead of working in competition, the group are working in unison towards onecommon goal.
          Each teams section must connect the other teams to create one large construction. There are certain features that need to be included such as a loop the loop, and a hair pin bend.

          Now any theme park rollercoaster needs to look the part! Each section must have a unique theme. Teams can visit out prop shop for all kinds of creative material to make their ride look the part. Now it gets nail biting! Once complete it’s time for testing. Teams release the ball at the start of the ride, ready for it to make it’s journey past the finish line.

          As the ball flows along the track teams nervously watch in hope that their section performs. The event is perfect for mixed groups and always creates a huge sense of achievement and celebration.

          Show moreShow less
          ★★★★★

          Hannah - Location was outstanding!

          What's included:

          • Instructor
          • Equipment
          • We can also source a venue on request
          • Minimum Group Size is 10

          Time to hit the theme park for this amazing creative activity! Your challenge is to build a working rollercoaster for a ball to travel along for at least 45 minutes. The ball must travel via it’s own kinetic motion and flow through a number of thrilling twists and turns.

          Your group will be divided into teams of 10. Each team must be one section of the rollercoaster . Now comes the fun part. Instead of working in competition, the group are working in unison towards onecommon goal.
          Each teams section must connect the other teams to create one large construction. There are certain features that need to be included such as a loop the loop, and a hair pin bend.

          Now any theme park rollercoaster needs to look the part! Each section must have a unique theme. Teams can visit out prop shop for all kinds of creative material to make their ride look the part. Now it gets nail biting! Once complete it’s time for testing. Teams release the ball at the start of the ride, ready for it to make it’s journey past the finish line.

          As the ball flows along the track teams nervously watch in hope that their section performs. The event is perfect for mixed groups and always creates a huge sense of achievement and celebration.

          Show moreShow less
          ★★★★★

          Alex - AC are always on hand to help

          What's included:

          • Instructor
          • Equipment
          • We can also source a venue on request
          • Minimum Group Size is 10

          Time to hit the theme park for this amazing creative activity! Your challenge is to build a working rollercoaster for a ball to travel along for at least 45 minutes. The ball must travel via it’s own kinetic motion and flow through a number of thrilling twists and turns.

          Your group will be divided into teams of 10. Each team must be one section of the rollercoaster . Now comes the fun part. Instead of working in competition, the group are working in unison towards onecommon goal.
          Each teams section must connect the other teams to create one large construction. There are certain features that need to be included such as a loop the loop, and a hair pin bend.

          Now any theme park rollercoaster needs to look the part! Each section must have a unique theme. Teams can visit out prop shop for all kinds of creative material to make their ride look the part. Now it gets nail biting! Once complete it’s time for testing. Teams release the ball at the start of the ride, ready for it to make it’s journey past the finish line.

          As the ball flows along the track teams nervously watch in hope that their section performs. The event is perfect for mixed groups and always creates a huge sense of achievement and celebration.

          Show moreShow less
          ★★★★★

          Sam - Stag do was a roaring success!

          What's included:

          • Instructor
          • Equipment
          • We can also source a venue on request
          • Minimum Group Size is 10

          Time to hit the theme park for this amazing creative activity! Your challenge is to build a working rollercoaster for a ball to travel along for at least 45 minutes. The ball must travel via it’s own kinetic motion and flow through a number of thrilling twists and turns.

          Your group will be divided into teams of 10. Each team must be one section of the rollercoaster . Now comes the fun part. Instead of working in competition, the group are working in unison towards onecommon goal.
          Each teams section must connect the other teams to create one large construction. There are certain features that need to be included such as a loop the loop, and a hair pin bend.

          Now any theme park rollercoaster needs to look the part! Each section must have a unique theme. Teams can visit out prop shop for all kinds of creative material to make their ride look the part. Now it gets nail biting! Once complete it’s time for testing. Teams release the ball at the start of the ride, ready for it to make it’s journey past the finish line.

          As the ball flows along the track teams nervously watch in hope that their section performs. The event is perfect for mixed groups and always creates a huge sense of achievement and celebration.

          Show moreShow less
          ★★★★★

          Barry - Perfect for a large sten party

          What's included:

          • Instructor
          • Equipment
          • We can also source a venue on request
          • Minimum Group Size is 10

          Time to hit the theme park for this amazing creative activity! Your challenge is to build a working rollercoaster for a ball to travel along for at least 45 minutes. The ball must travel via it’s own kinetic motion and flow through a number of thrilling twists and turns.

          Your group will be divided into teams of 10. Each team must be one section of the rollercoaster . Now comes the fun part. Instead of working in competition, the group are working in unison towards onecommon goal.
          Each teams section must connect the other teams to create one large construction. There are certain features that need to be included such as a loop the loop, and a hair pin bend.

          Now any theme park rollercoaster needs to look the part! Each section must have a unique theme. Teams can visit out prop shop for all kinds of creative material to make their ride look the part. Now it gets nail biting! Once complete it’s time for testing. Teams release the ball at the start of the ride, ready for it to make it’s journey past the finish line.

          As the ball flows along the track teams nervously watch in hope that their section performs. The event is perfect for mixed groups and always creates a huge sense of achievement and celebration.

          Show moreShow less
          ★★★★★

          Rachael - Great options for hen parties

          What's included:

          • Instructor
          • Equipment
          • We can also source a venue on request
          • Minimum Group Size is 10

          Time to hit the theme park for this amazing creative activity! Your challenge is to build a working rollercoaster for a ball to travel along for at least 45 minutes. The ball must travel via it’s own kinetic motion and flow through a number of thrilling twists and turns.

          Your group will be divided into teams of 10. Each team must be one section of the rollercoaster . Now comes the fun part. Instead of working in competition, the group are working in unison towards onecommon goal.
          Each teams section must connect the other teams to create one large construction. There are certain features that need to be included such as a loop the loop, and a hair pin bend.

          Now any theme park rollercoaster needs to look the part! Each section must have a unique theme. Teams can visit out prop shop for all kinds of creative material to make their ride look the part. Now it gets nail biting! Once complete it’s time for testing. Teams release the ball at the start of the ride, ready for it to make it’s journey past the finish line.

          As the ball flows along the track teams nervously watch in hope that their section performs. The event is perfect for mixed groups and always creates a huge sense of achievement and celebration.

          Show moreShow less

          Plan the ultimate event in 3 simple steps

          Making not so simple events, simpler.
          • Build your trip

            Choose from hundreds of houses, hotels & activities< to create an iconic getaway. Alternatively, get in touch and our specialists will piece together a bespoke proposal.

          • Secure a booking

            All of our trips can be booked with small deposits so once you’ve decided on a trip, you can secure it super-fast and hassle-free through your party portal 24/7.

          • Finalise the nitty gritty

            With an AC trip, you can change your group size and add bolt-ons up to 8 weeks before your event. Your event manager will also be on hand to help from your first click to your last drink.

          Make a quick enquiry

          Make A Quick Enquiry
          Sending